πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Castle Pill Farm 1 - A, C

Castle Pill Farm 1 - A, C is a 3.15 MW onshore wind farm in Wales, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningJun 2005 (completed)
  2. ConsentedDec 2005 (completed)
  3. Construction (completed)
  4. OperatingJun 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.15 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
51.7242, -5.0072

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Castle Pill Farm 1 - A, C compares

450th of 488largest wind farms in the UK register
39th of 43in Wales
0.01%of listed UK wind farms capacity
β‰ˆ 7.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 3.15 MW station would generate roughly 7.2 GWh of electricity in a year, similar to the annual use of about 2,660 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Castle Pill - Repowering
Developer / operator
John Laing Environmental Assets Group
Planning authority
Pembrokeshire
Planning reference
05/0394/PA
Application submitted
22 June 2005
Permission granted
19 December 2005
Began operating
1 June 2009
Capacity in planning record
3.2 MW
Address
Steynton, Pembroke, Dyfed, Dyfed, SA7 1
REPD reference
3313

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.