Hill House Farm

Hill House Farm is a 28.3 MW solar farm in South West England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningAug 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
28.3 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
GL2 7AN
Coordinates
51.7357, -2.3624

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hill House Farm compares

31st of 662largest solar farms in the UK register
5th of 192in South West
0.50%of listed UK solar farms capacity
β‰ˆ 25 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 28.3 MW station would generate roughly 25 GWh of electricity in a year, similar to the annual use of about 9,190 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hillhouse Farm
Developer / operator
Cambridge Solar Power/ Vogt Solar
Planning authority
Stroud
Planning reference
S.14/1800/FUL
Application submitted
5 August 2014
Permission granted
8 December 2014
Construction started
1 January 2015
Began operating
31 March 2015
Capacity in planning record
28.5 MW
Address
Hillhouse Farm Bristol Road, Cambridge, Gloucester, Gloucestershire, Gloucestershire, GL2 7AN
REPD reference
2238

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.