EPR Ely Ltd is a 38 MW biomass power station in East of England, England, operated by EPR. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Bioenergy
- East of England
- England
Key facts
- Installed capacity
- 38 MW
- Status
- Operational
- Technology
- Bioenergy
- Operator
- EPR
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CB6 2QE
- Coordinates
- 52.3979, 0.1297
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How EPR Ely Ltd compares
Biomass power stations burn organic material such as wood pellets, energy crops or agricultural residues to raise steam for a turbine.
All biomass power stations Power stations in East of EnglandNearby power stations
- Wilburton Β· 4.99 MW solar farm6.4 km
- Willburton 2 (Mingay Farm) Β· 19.3 MW solar farm7.2 km
- Honeysome Β· 4.35 MW solar farm8.8 km
- Stowbridge Β· 24.3 MW solar farm9.7 km
- Chittering Β· 4.99 MW solar farm10.8 km
- Chittering 2 Β· 6.3 MW solar farm11.0 km
- Glassmoor I Β· 16 MW onshore wind farm12.4 km
- Ransonmoor Β· 10 MW onshore wind farm14.4 km
Also operated by EPR
EPR operates 7 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Elean Business Park Biomass Plant
- Developer / operator
- European Development Corporation
- Planning authority
- East Cambridgeshire
- Application submitted
- 8 November 1995
- Permission granted
- 22 February 1996
- Began operating
- 22 September 2000
- Capacity in planning record
- 40 MW
- Address
- Elean Business Park Sutton Cambridgeshire, Cambridgeshire
- REPD reference
- 78
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.