SOLAR Β· OPERATIONAL

Honeysome

Honeysome is a 4.35 MW solar farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningMay 2015 (completed)
  2. ConsentedDec 2015 (completed)
  3. Construction (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.35 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE16 6TG
Coordinates
52.4554, 0.0406

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Honeysome compares

507th of 662largest solar farms in the UK register
72nd of 76in East of England
0.08%of listed UK solar farms capacity
β‰ˆ 3.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.35 MW station would generate roughly 3.8 GWh of electricity in a year, similar to the annual use of about 1,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land East Of Honeysome Road
Developer / operator
Honeysome Road Solar
Planning authority
Fenland
Planning reference
F/YR15/0429/F
Application submitted
20 May 2015
Permission granted
14 December 2015
Began operating
15 March 2016
Capacity in planning record
4.6 MW
Address
Land East Of, Honeysome Road, Honeysome Farm Bungalow, Chatteris, Cambridgeshire, PE16 6SB
REPD reference
5302

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source