Honeysome
Honeysome is a 4.35 MW solar farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East of England
- England
Key facts
- Installed capacity
- 4.35 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE16 6TG
- Coordinates
- 52.4554, 0.0406
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Honeysome compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.35 MW station would generate roughly 3.8 GWh of electricity in a year, similar to the annual use of about 1,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East of England All run by Greencoat CapitalNearby generating sites
- Ransonmoor Β· 10 MW onshore wind farm6.4 km
- Glassmoor I Β· 16 MW onshore wind farm7.5 km
- Greenvale March Β· 1.5 MW onshore wind farm7.7 km
- EPR Ely Ltd Β· 38 MW biomass power station8.8 km
- Burnthouse Β· 4.76 MW solar farm9.2 km
- Turves Β· 5 MW solar farm9.5 km
- Ramsey Β· 1.8 MW onshore wind farm10.0 km
- Burnthouse Windfarm Β· 6 MW onshore wind farm10.4 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land East Of Honeysome Road
- Developer / operator
- Honeysome Road Solar
- Planning authority
- Fenland
- Planning reference
- F/YR15/0429/F
- Application submitted
- 20 May 2015
- Permission granted
- 14 December 2015
- Began operating
- 15 March 2016
- Capacity in planning record
- 4.6 MW
- Address
- Land East Of, Honeysome Road, Honeysome Farm Bungalow, Chatteris, Cambridgeshire, PE16 6SB
- REPD reference
- 5302
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.