Greenvale March
Greenvale March is a 1.5 MW onshore wind farm in East of England, England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- East of England
- England
Key facts
- Installed capacity
- 1.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- WPO UK Services
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 52.5195, -0.0021
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Greenvale March compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 1.5 MW station would generate roughly 3.4 GWh of electricity in a year, similar to the annual use of about 1,270 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East of England All run by WPO UK ServicesNearby generating sites
- Burnthouse Β· 4.76 MW solar farm1.8 km
- Turves Β· 5 MW solar farm2.0 km
- Ransonmoor Β· 10 MW onshore wind farm2.4 km
- Burnthouse Windfarm Β· 6 MW onshore wind farm2.9 km
- Glassmoor II Β· 12.3 MW onshore wind farm7.2 km
- Glassmoor I Β· 16 MW onshore wind farm7.5 km
- Honeysome Β· 4.35 MW solar farm7.7 km
- Stags Holt Β· 20 MW onshore wind farm10.2 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Greenvale AP Wind Turbine
- Developer / operator
- Greenvale AP
- Planning authority
- Fenland
- Planning reference
- F/YR12/0514/F
- Application submitted
- 10 July 2012
- Permission granted
- 24 September 2012
- Construction started
- 1 May 2014
- Began operating
- 1 August 2014
- Capacity in planning record
- 1.5 MW
- Address
- Land North West Of Greenvale Produce Ltd, Floods Ferry Road, Doddington, Cambridgeshire
- REPD reference
- 4374
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.