WIND Β· OPERATIONAL

Burnthouse Windfarm

Burnthouse Windfarm is a 6 MW onshore wind farm in East of England, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East of England
  • England
Project stageOperating
  1. PlanningJun 2009 (completed)
  2. ConsentedJul 2011 (completed)
  3. ConstructionJan 2013 (completed)
  4. OperatingJun 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE7 2DQ
Coordinates
52.5373, -0.0337

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Burnthouse Windfarm compares

394th of 488largest wind farms in the UK register
36th of 48in East of England
0.02%of listed UK wind farms capacity
β‰ˆ 14 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,060 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Burnt House Farm
Developer / operator
Fivestone Ltd
Planning authority
Fenland
Planning reference
F/YR09/0392/F
Application submitted
10 June 2009
Permission granted
8 July 2011
Construction started
1 January 2013
Began operating
19 June 2013
Capacity in planning record
6 MW
Address
Burnt House Road, Whittlesey, Burnthouse Sidings, Peterborough, Cambs, Cambridgeshire, PE7 2HP
REPD reference
3686

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.