EPR Scotland Ltd
EPR Scotland Ltd is a 12.5 MW biomass power station in Scotland, operated by EPR. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Bioenergy
- Scotland
Key facts
- Installed capacity
- 12.5 MW
- Status
- Operational
- Technology
- Bioenergy
- Operator
- EPR
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- KY5 0HR
- Coordinates
- 56.1417, -3.3051
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How EPR Scotland Ltd compares
Biomass power stations burn organic material such as wood pellets, energy crops or agricultural residues to raise steam for a turbine.
All biomass power stations Power stations in ScotlandNearby power stations
- Westfield Β· 10 MW onshore wind farm0.7 km
- Little Raith (GB) Β· 24.8 MW onshore wind farm4.1 km
- Mossmorran Β· 4.6 MW onshore wind farm5.7 km
- Middle Balbeggie Β· 6.4 MW onshore wind farm8.8 km
- Middle Balbeggie Β· 5 MW solar farm9.6 km
- West Strathore Β· 4.98 MW solar farm9.9 km
- Markinch Β· 61 MW biomass power station11.0 km
- FMC Dunfermline Β· 1.5 MW onshore wind farm12.9 km
Also operated by EPR
EPR operates 7 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Westfield Biomass Power Station
- Developer / operator
- EPR Scotland
- Planning authority
- Fife
- Application submitted
- 3 March 1994
- Permission granted
- 5 December 1995
- Began operating
- 21 August 2000
- Capacity in planning record
- 12.5 MW
- Address
- Westfield Development Centre, Fife, Fife
- REPD reference
- 62
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.