SOLAR Β· OPERATIONAL

Middle Balbeggie

Middle Balbeggie is a 5 MW solar farm in Scotland, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Scotland
Project stageOperating
  1. PlanningSep 2015 (completed)
  2. ConsentedDec 2015 (completed)
  3. ConstructionOct 2016 (completed)
  4. OperatingJan 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
KY1 3NW
Coordinates
56.1525, -3.1512

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Middle Balbeggie compares

252nd of 662largest solar farms in the UK register
3rd of 9in Scotland
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Scotland All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Lightsource Renewable Energy
Planning authority
Fife
Planning reference
15/02687/FULL
Application submitted
16 September 2015
Permission granted
17 December 2015
Construction started
17 October 2016
Began operating
27 January 2017
Capacity in planning record
5 MW
Address
Ld To N Of Redhouse Grid Subst, Thornton Road, Kirkcaldy, Fife, KY1 3NN
REPD reference
5797

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.