WIND Β· OPERATIONAL

Mossmorran

Mossmorran is a 4.6 MW onshore wind farm in Scotland, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningApr 2011 (completed)
  2. ConsentedJan 2012 (completed)
  3. ConstructionSep 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Capital Dynamics UK
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
KY4 8EP
Coordinates
56.0905, -3.3177

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Mossmorran compares

426th of 488largest wind farms in the UK register
191st of 199in Scotland
0.02%of listed UK wind farms capacity
β‰ˆ 10 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 4.6 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,880 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Capital Dynamics UK

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Mossmorran Wind Farm
Developer / operator
Airvolution Energy
Planning authority
Fife
Planning reference
11/01807/FULL
Application submitted
1 April 2011
Permission granted
13 January 2012
Construction started
1 September 2015
Began operating
1 December 2015
Capacity in planning record
4.6 MW
Address
Land At To The West Of Chemical Works, Mossmorran,, Fife
REPD reference
2780

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source