Ovenden Moor
Ovenden Moor is a 18 MW onshore wind farm in Yorkshire and the Humber, England, operated by EPR. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 18 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- EPR
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- HX2 7UA
- Coordinates
- 53.7744, -1.9362
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Ovenden Moor compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 18 MW station would generate roughly 41 GWh of electricity in a year, similar to the annual use of about 15,180 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Yorkshire and the Humber All run by EPRNearby generating sites
- Coal Clough RP Β· 16 MW onshore wind farm14.3 km
- Hameldon Hill Β· 6 MW onshore wind farm14.8 km
- Thornhill Β· 40 MW open-cycle gas power station21.3 km
- Hameldon Hill Extension Β· 6 MW onshore wind farm24.3 km
- Scout Moor Wind Farm Ltd Β· 65 MW onshore wind farm24.8 km
- Shuttleworth Β· 5 MW solar farm27.8 km
- Blackstone Edge Β· 7.5 MW onshore wind farm29.8 km
- Hazlehead Wind Farm Β· 6.15 MW onshore wind farm30.2 km
Also operated by EPR
EPR operates 7 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Ovenden Moor (Repower)
- Developer / operator
- Yorkshire Windpower
- Planning authority
- Calderdale
- Planning reference
- 12/00955/WDF
- Application submitted
- 2 August 2012
- Permission granted
- 16 November 2012
- Construction started
- 21 May 2015
- Began operating
- 24 January 2017
- Capacity in planning record
- 18 MW
- Address
- Withens Road, Wainstalls, Halifax,, West Yorkshire
- REPD reference
- 4408
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026