Scout Moor Wind Farm Ltd
Scout Moor Wind Farm Ltd is a 65 MW onshore wind farm in North West England, operated by BayWa R.E. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North West
- England
Key facts
- Installed capacity
- 65 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- BayWa R.E
- Region
- North West
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- OL12 7TY
- Coordinates
- 53.6690, -2.2679
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Scout Moor Wind Farm Ltd compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 65 MW station would generate roughly 148 GWh of electricity in a year, similar to the annual use of about 54,830 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North West All run by BayWa R.ENearby generating sites
- Hameldon Hill Extension Β· 6 MW onshore wind farm11.6 km
- Coal Clough RP Β· 16 MW onshore wind farm11.9 km
- Hameldon Hill Β· 6 MW onshore wind farm15.0 km
- Bent Spur Β· 4.99 MW solar farm16.7 km
- Blackburn Β· 60 MW CCGT gas power station18.5 km
- Ovenden Moor Β· 18 MW onshore wind farm24.8 km
- Carrington Power Β· 884 MW CCGT gas power station27.7 km
- Fell View Β· 4.26 MW solar farm28.1 km
Also operated by BayWa R.E
BayWa R.E operates 3 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Scout Moor Windfarm
- Developer / operator
- Munich Re (previously Peel)
- Planning authority
- Rossendale
- Application submitted
- 30 June 2003
- Permission granted
- 25 May 2005
- Construction started
- 1 September 2007
- Began operating
- 1 June 2008
- Capacity in planning record
- 65 MW
- Address
- Land at Scout Moor , off Edenfield Road , Rochdale, Lancashire
- REPD reference
- 3177
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.