Fell View

Fell View is a 4.26 MW solar farm in North West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • North West
  • England
Project stageOperating
  1. PlanningApr 2015 (completed)
  2. ConsentedAug 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.26 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PR2 5SD
Coordinates
53.7986, -2.6342

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Fell View compares

515th of 662largest solar farms in the UK register
19th of 23in North West
0.08%of listed UK solar farms capacity
β‰ˆ 3.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.26 MW station would generate roughly 3.7 GWh of electricity in a year, similar to the annual use of about 1,380 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in North West All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Fell View Farm (Phase 2)
Developer / operator
Anesco
Planning authority
Preston
Planning reference
06/2015/0288
Application submitted
13 April 2015
Permission granted
4 August 2015
Construction started
15 January 2016
Began operating
15 March 2016
Capacity in planning record
2.9 MW
Address
Land At Fell View Farm, Preston Road, Grimsargh, Preston, Lancashire, PR2 5SD
REPD reference
5261

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.