West Field
West Field is a 4.94 MW solar farm in North West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- North West
- England
Key facts
- Installed capacity
- 4.94 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- North West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PR3 0PU
- Coordinates
- 53.8726, -2.7654
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How West Field compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.94 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,600 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in North West All run by AnescoNearby generating sites
- Bilsborrow Β· 4.99 MW solar farm3.0 km
- Orchard End Windfarm Β· 4 MW onshore wind farm7.3 km
- Fell View Β· 4.26 MW solar farm11.9 km
- Grimsargh Β· 2.92 MW solar farm11.9 km
- Wrea Green Β· 4.88 MW solar farm15.4 km
- Staining Wood Β· 5 MW solar farm16.0 km
- Arnawood Β· 4.99 MW solar farm17.7 km
- Carver Hey Β· 2.51 MW solar farm18.5 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Westfield Farm
- Developer / operator
- Hive Energy/ Vogt Solar
- Planning authority
- Wyre
- Planning reference
- 14/00909/LMAJ
- Application submitted
- 12 November 2014
- Permission granted
- 6 May 2015
- Construction started
- 1 November 2015
- Began operating
- 15 January 2016
- Capacity in planning record
- 5 MW
- Address
- Westfield Farm, Catterall, Lancashire, PR3 0PU
- REPD reference
- 4887
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.