πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Orchard End Windfarm

Orchard End Windfarm is a 4 MW onshore wind farm in North West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North West
  • England
Project stageOperating
  1. PlanningMay 2009 (completed)
  2. ConsentedDec 2010 (completed)
  3. ConstructionAug 2012 (completed)
  4. OperatingJun 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PR3 6BA
Coordinates
53.9001, -2.8657

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Orchard End Windfarm compares

433rd of 488largest wind farms in the UK register
28th of 32in North West
0.01%of listed UK wind farms capacity
β‰ˆ 9.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 4 MW station would generate roughly 9.1 GWh of electricity in a year, similar to the annual use of about 3,370 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Orchard End
Developer / operator
Renewable Energy Generation
Planning authority
Wyre
Planning reference
09/00352/FULMAJ
Application submitted
12 May 2009
Permission granted
16 December 2010
Construction started
1 August 2012
Began operating
17 June 2013
Capacity in planning record
4 MW
Address
land at Orchard End, near Pilling, Eagland Hill, Preston, Lancashire
REPD reference
3703

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.