πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Bagmoor Wind Ltd

Bagmoor Wind Ltd is a 16 MW onshore wind farm in Yorkshire and the Humber, England, operated by BayWa R.E. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJan 2005 (completed)
  2. ConsentedApr 2006 (completed)
  3. Construction (completed)
  4. OperatingJul 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
16 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
BayWa R.E
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
DN15 9GH
Coordinates
53.6277, -0.6672

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bagmoor Wind Ltd compares

257th of 488largest wind farms in the UK register
16th of 31in Yorkshire and the Humber
0.05%of listed UK wind farms capacity
β‰ˆ 36 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 16 MW station would generate roughly 36 GWh of electricity in a year, similar to the annual use of about 13,500 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by BayWa R.E

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bagmoor
Developer / operator
Munich Re (previously Wind Prospect)
Planning authority
North Lincolnshire
Application submitted
15 January 2005
Permission granted
1 April 2006
Began operating
1 July 2009
Capacity in planning record
16 MW
Address
2km East of Flixborough, Humberside
REPD reference
2928

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.