πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Tir Mostyn & Foel Goch Ltd

Tir Mostyn & Foel Goch Ltd is a 21.3 MW onshore wind farm in Wales, operated by BayWa R.E. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningSep 1999 (completed)
  2. ConsentedDec 2002 (completed)
  3. Construction (completed)
  4. OperatingJun 2005 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
21.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
BayWa R.E
Region
Wales
Country
Wales
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
LL16 5RN
Coordinates
53.1170, -3.4911

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Tir Mostyn & Foel Goch Ltd compares

217th of 488largest wind farms in the UK register
18th of 43in Wales
0.07%of listed UK wind farms capacity
β‰ˆ 48 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 21.3 MW station would generate roughly 48 GWh of electricity in a year, similar to the annual use of about 17,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by BayWa R.E

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Tir Mostyn And Foel Goch Wind Farm
Developer / operator
Munich Re (previously Windjen Power Ltd)
Planning authority
Denbighshire
Planning reference
25/710/99/PF
Application submitted
22 September 1999
Permission granted
19 December 2002
Began operating
1 June 2005
Capacity in planning record
21.3 MW
Address
Nantglyn, Denbighshire, Clwyd
REPD reference
4689

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.