Tir Mostyn & Foel Goch Ltd is a 21.3 MW onshore wind farm in Wales, operated by BayWa R.E. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 21.3 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- BayWa R.E
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- LL16 5RN
- Coordinates
- 53.1170, -3.4911
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Tir Mostyn & Foel Goch Ltd compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 21.3 MW station would generate roughly 48 GWh of electricity in a year, similar to the annual use of about 17,930 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by BayWa R.ENearby generating sites
- Clocaenog Forest Β· 96 MW onshore wind farm1.4 km
- Moel Moelogan 2 Β· 11.7 MW onshore wind farm15.8 km
- Moel Moelogan Β· 2.6 MW onshore wind farm16.0 km
- Kinmel 2 Β· 4.99 MW solar farm18.5 km
- Kinmel 1 Β· 5 MW solar farm19.0 km
- Teyrdan CIC Β· 4.62 MW solar farm21.0 km
- Teyrdan SPV Β· 4.68 MW solar farm21.0 km
- Dulyn Β· 0.51 MW small hydro scheme24.4 km
Also operated by BayWa R.E
BayWa R.E operates 3 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Tir Mostyn And Foel Goch Wind Farm
- Developer / operator
- Munich Re (previously Windjen Power Ltd)
- Planning authority
- Denbighshire
- Planning reference
- 25/710/99/PF
- Application submitted
- 22 September 1999
- Permission granted
- 19 December 2002
- Began operating
- 1 June 2005
- Capacity in planning record
- 21.3 MW
- Address
- Nantglyn, Denbighshire, Clwyd
- REPD reference
- 4689
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.