Blackstone Edge
Blackstone Edge is a 7.5 MW onshore wind farm in Yorkshire and the Humber, England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 7.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- S36 9PA
- Coordinates
- 53.5433, -1.7062
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Blackstone Edge compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 7.5 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,330 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Yorkshire and the Humber All run by Venitent Energy ServicesNearby generating sites
- Hazlehead Wind Farm Β· 6.15 MW onshore wind farm2.1 km
- Royd Moor Β· 6.5 MW onshore wind farm2.7 km
- Thornhill Β· 40 MW open-cycle gas power station15.1 km
- Park Spring Β· 8.55 MW onshore wind farm20.4 km
- Blackburn Meadows Β· 34 MW biomass power station24.5 km
- Ovenden Moor Β· 18 MW onshore wind farm29.8 km
- Marr Wind Farm Β· 8.2 MW onshore wind farm31.8 km
- Penny Hill Wind Farm Β· 20.4 MW onshore wind farm32.4 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Ventient (formerly Infinis)
- Planning authority
- Barnsley
- Planning reference
- 2008/0171
- Application submitted
- 1 November 2006
- Permission granted
- 26 May 2009
- Construction started
- 1 July 2012
- Began operating
- 1 March 2013
- Capacity in planning record
- 7.5 MW
- Address
- Blackstone Edge, Penistone, South Yorkshire
- REPD reference
- 3958
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.