WIND Β· OPERATIONAL

Park Spring

Park Spring is a 8.55 MW onshore wind farm in Yorkshire and the Humber, England, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningOct 2013 (completed)
  2. ConsentedApr 2014 (completed)
  3. ConstructionApr 2015 (completed)
  4. OperatingNov 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.55 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
S72 7GX
Coordinates
53.5740, -1.4021

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Park Spring compares

353rd of 488largest wind farms in the UK register
24th of 31in Yorkshire and the Humber
0.03%of listed UK wind farms capacity
β‰ˆ 19 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8.55 MW station would generate roughly 19 GWh of electricity in a year, similar to the annual use of about 7,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Park Spring Wind Farm
Developer / operator
EDF Energy Renewables
Planning authority
Barnsley
Planning reference
2013/0860
Application submitted
7 October 2013
Permission granted
9 April 2014
Construction started
15 April 2015
Began operating
20 November 2015
Capacity in planning record
8.6 MW
Address
Ferry Moor Lane, Cudworth, Barnsley, South Yorkshire
REPD reference
4410

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source