SOLAR Β· OPERATIONAL

Askern

Askern is a 4.97 MW solar farm in Yorkshire and the Humber, England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningAug 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionMar 2015 (completed)
  4. OperatingAug 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.97 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DN6 0BZ
Coordinates
53.6185, -1.1633

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Askern compares

406th of 662largest solar farms in the UK register
12th of 14in Yorkshire and the Humber
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.97 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,610 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Yorkshire and the Humber All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Askern Colliery solar farm
Developer / operator
Anesco
Planning authority
Doncaster
Planning reference
14/01829/FULM
Application submitted
1 August 2014
Permission granted
8 December 2014
Construction started
12 March 2015
Began operating
14 August 2015
Capacity in planning record
5 MW
Address
Land At Former Colliery, Campsall Road, Askern, Doncaster, South Yorkshire, DN6 0BT
REPD reference
2213

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source