Pollington Airfield

Pollington Airfield is a 5 MW solar farm in Yorkshire and the Humber, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningMay 2015 (completed)
  2. ConsentedJul 2015 (completed)
  3. ConstructionNov 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DN14 0BA
Coordinates
53.6799, -1.0664

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Pollington Airfield compares

252nd of 662largest solar farms in the UK register
2nd of 14in Yorkshire and the Humber
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Yorkshire and the Humber All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land at Pollington Airfield
Developer / operator
Lightsource Renewable Energy
Planning authority
East Riding of Yorkshire
Planning reference
15/01403/STPLF
Application submitted
15 May 2015
Permission granted
24 July 2015
Construction started
2 November 2015
Began operating
21 December 2015
Capacity in planning record
5 MW
Address
Land at Pollington Airfield, Gowdall Lane, Pollington, Goole, Humberside, Humberside, DN14 0AU
REPD reference
5322

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.