SOLAR Β· OPERATIONAL

Ermine Street

Ermine Street is a 32.5 MW solar farm in East Midlands England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningAug 2013 (completed)
  2. ConsentedDec 2013 (completed)
  3. Construction (completed)
  4. OperatingJul 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
32.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NG34 8QT
Coordinates
53.0152, -0.5214

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Ermine Street compares

23rd of 662largest solar farms in the UK register
5th of 95in East Midlands
0.57%of listed UK solar farms capacity
β‰ˆ 28 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 32.5 MW station would generate roughly 28 GWh of electricity in a year, similar to the annual use of about 10,530 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ermine Street Farm solar park
Developer / operator
Octopus Investments
Planning authority
North Kesteven
Planning reference
13/0929/FUL
Application submitted
20 August 2013
Permission granted
6 December 2013
Began operating
29 July 2014
Capacity in planning record
32.5 MW
Address
Land At Ermine Street Farm Ermine Street Ancaster Heath Grantham Lincolnshire, Lincolnshire, NG32 3RN
REPD reference
1528

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.