Sycamore

Sycamore is a 19 MW solar farm in South East England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningOct 2012 (completed)
  2. ConsentedJan 2013 (completed)
  3. ConstructionFeb 2014 (completed)
  4. OperatingMay 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
19 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TN29 9SY
Coordinates
50.9924, 0.8763

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Sycamore compares

59th of 662largest solar farms in the UK register
8th of 105in South East
0.34%of listed UK solar farms capacity
β‰ˆ 17 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 19 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,170 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Sycamore Farm
Developer / operator
BNRG Renewables
Planning authority
Folkestone and Hythe
Planning reference
Y12/0918/SH
Application submitted
8 October 2012
Permission granted
17 January 2013
Construction started
11 February 2014
Began operating
30 May 2014
Capacity in planning record
20 MW
Address
Millbank Lane Old Romney Kent TN29 9SY, Kent
REPD reference
1775

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.