WIND Β· OPERATIONAL

Little Cheyne Court

Little Cheyne Court is a 59.8 MW onshore wind farm in South East England, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • South East
  • England
Project stageOperating
  1. PlanningNov 2002 (completed)
  2. ConsentedOct 2005 (completed)
  3. ConstructionJul 2008 (completed)
  4. OperatingJun 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
59.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RWE Npower
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
50.9638, 0.8227

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Little Cheyne Court compares

93rd of 488largest wind farms in the UK register
5th of 7in South East
0.20%of listed UK wind farms capacity
β‰ˆ 136 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 59.8 MW station would generate roughly 136 GWh of electricity in a year, similar to the annual use of about 50,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South East All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Little Cheyne Court Wind Farm
Developer / operator
RWE npower
Planning authority
Folkestone and Hythe
Planning reference
YO2/1278/SH
Application submitted
28 November 2002
Permission granted
18 October 2005
Construction started
1 July 2008
Began operating
1 June 2009
Capacity in planning record
59.8 MW
Address
Little Cheyne Court, Romney Marsh Near Lydd Kent, Kent
REPD reference
3096

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026