Drax Power Station Biomass Units
Drax Power Station Biomass Units is a 2,580 MW biomass power station in Yorkshire and the Humber, England, operated by Drax Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Bioenergy
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 2,580 MW
- Status
- Operational
- Technology
- Bioenergy
- Operator
- Part of Drax Group
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- YO8 8PH
- Coordinates
- 53.7356, -0.9911
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Drax Power Station Biomass Units compares
Biomass power stations burn organic material such as wood pellets, energy crops or agricultural residues to raise steam for a turbine.
All biomass power stations Power stations in Yorkshire and the HumberNearby power stations
- Drax Power Station Β· 2,595 MW biomass power station0.4 km
- Rusholme Β· 24 MW onshore wind farm2.9 km
- Primrose Hill Β· 4.35 MW solar farm6.4 km
- Pollington Airfield Β· 5 MW solar farm7.9 km
- Eggborough Power Station Β· 1,960 MW coal-fired power station9.0 km
- Goole Fields B Β· 34.9 MW onshore wind farm9.5 km
- Spaldington Β· 11.8 MW onshore wind farm10.0 km
- Goole Fields A Β· 33 MW onshore wind farm10.2 km
Also operated by Part of Drax Group
Part of Drax Group operates 10 sites in the register. Largest first:
- Cruachan Β· pumped-storage station440 MW
- Tongland Β· hydroelectric station33 MW
- Kendoon Β· hydroelectric station24 MW
- Glenlee Β· hydroelectric station24 MW
- Earlstoun Β· hydroelectric station14 MW
- Carsfad Β· hydroelectric station12 MW
- Bonnington Β· hydroelectric station11 MW
- Stonebyres Β· hydroelectric station6 MW
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.