WIND Β· OPERATIONAL

Spaldington

Spaldington is a 11.8 MW onshore wind farm in Yorkshire and the Humber, England, operated by Falck Renewables SpA. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningNov 2009 (completed)
  2. ConsentedSep 2011 (completed)
  3. ConstructionJun 2013 (completed)
  4. OperatingMay 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
11.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Falck Renewables SpA
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
53.7788, -0.8576

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Spaldington compares

313th of 488largest wind farms in the UK register
20th of 31in Yorkshire and the Humber
0.04%of listed UK wind farms capacity
β‰ˆ 27 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 11.8 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 9,910 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Falck Renewables SpA

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Spaldington Airfield
Developer / operator
Falck Renewables
Planning authority
East Riding of Yorkshire
Planning reference
09/04550/STPLFE
Application submitted
18 November 2009
Permission granted
29 September 2011
Construction started
1 June 2013
Began operating
11 May 2016
Capacity in planning record
12.5 MW
Address
Holme Road, Spaldington, East Riding, Yorkshire. DN14 7NB, Humberside
REPD reference
3700

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.