WIND Β· OPERATIONAL

Sober Hill Wind Farm Ltd

Sober Hill Wind Farm Ltd is a 12.3 MW onshore wind farm in Yorkshire and the Humber, England, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Key facts

Installed capacity
12.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Engie Power
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
YO43 4TG
Coordinates
53.8289, -0.7712

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Sober Hill Wind Farm Ltd compares

295th of 488largest wind farms in the UK register
18th of 31in Yorkshire and the Humber
0.04%of listed UK wind farms capacity
β‰ˆ 28 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12.3 MW station would generate roughly 28 GWh of electricity in a year, similar to the annual use of about 10,380 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Engie Power

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.