WIND Β· OPERATIONAL

Sancton Hill Wind Farm

Sancton Hill Wind Farm is a 10 MW onshore wind farm in Yorkshire and the Humber, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningMay 2010 (completed)
  2. ConsentedFeb 2011 (completed)
  3. ConstructionNov 2011 (completed)
  4. OperatingJun 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
YO43 4TG
Coordinates
53.8451, -0.6099

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Sancton Hill Wind Farm compares

326th of 488largest wind farms in the UK register
21st of 31in Yorkshire and the Humber
0.03%of listed UK wind farms capacity
β‰ˆ 23 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Sancton Hill
Developer / operator
REG Windpower (previously Cornwall Light and Power)
Planning authority
East Riding of Yorkshire
Planning reference
10/02080/STPLFE
Application submitted
17 May 2010
Permission granted
10 February 2011
Construction started
1 November 2011
Began operating
12 June 2012
Capacity in planning record
10 MW
Address
nr Market Weighton, Sancton, York,, Humberside
REPD reference
3735

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026