SOLAR Β· OPERATIONAL

Carlam Hill Education

Carlam Hill Education is a 5 MW solar farm in Yorkshire and the Humber, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningApr 2015 (completed)
  2. ConsentedJun 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingJun 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
HU7 5YX
Coordinates
53.8085, -0.3158

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carlam Hill Education compares

252nd of 662largest solar farms in the UK register
2nd of 14in Yorkshire and the Humber
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Yorkshire and the Humber All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Carlam Hill Education CIC
Developer / operator
Greencoat (formerly Renesola)
Planning authority
Kingston upon Hull, City of
Planning reference
15/00511/FULL
Application submitted
23 April 2015
Permission granted
12 June 2015
Construction started
18 January 2016
Began operating
24 June 2016
Capacity in planning record
5 MW
Address
Carlam Hill Farm, East of Cumbrian Way, Kingston Upon Hull, Humberside, HU7 5YX
REPD reference
4804

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.