WIND Β· OPERATIONAL

Tedder Hill

Tedder Hill is a 7.5 MW onshore wind farm in Yorkshire and the Humber, England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England

Key facts

Installed capacity
7.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
HU19 2BY
Coordinates
53.7523, -0.0265

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Tedder Hill compares

371st of 488largest wind farms in the UK register
26th of 31in Yorkshire and the Humber
0.03%of listed UK wind farms capacity
β‰ˆ 17 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 7.5 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,330 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Tedder Hill Wind cluster
Developer / operator
Ventient (formerly Infinis)
Planning authority
East Riding of Yorkshire
Planning reference
06/03729/STPLF
Application submitted
11 May 2006
Permission granted
28 January 2010
Construction started
30 October 2012
Began operating
30 August 2013
Capacity in planning record
7.5 MW
Address
near Roos, East Riding of Yorkshire, Humberside
REPD reference
3749

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.