SOLAR Β· OPERATIONAL

Ottringham

Ottringham is a 6.07 MW solar farm in Yorkshire and the Humber, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Yorkshire and the Humber
  • England

Key facts

Installed capacity
6.07 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
HU12 0AD
Coordinates
53.6985, -0.0693

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Ottringham compares

223rd of 662largest solar farms in the UK register
1st of 14in Yorkshire and the Humber
0.11%of listed UK solar farms capacity
β‰ˆ 5.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 6.07 MW station would generate roughly 5.3 GWh of electricity in a year, similar to the annual use of about 1,970 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Yorkshire and the Humber All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Redhall Industrial Estate
Developer / operator
Dodds Limited
Planning authority
East Riding of Yorkshire
Planning reference
12/04362/STPLF
Application submitted
22 October 2012
Permission granted
21 January 2013
Began operating
8 August 2014
Capacity in planning record
5 MW
Address
Land South And East Of Redhall Industrial Estate Patrington Road Ottringham East Riding Of Yorkshire HU12 0AD, Humberside, HU12 0AD
REPD reference
2019

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.