WIND Β· OPERATIONAL

Roos Wind Farm (GB)

Roos Wind Farm (GB) is a 17.1 MW onshore wind farm in Yorkshire and the Humber, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJan 2009 (completed)
  2. ConsentedMay 2010 (completed)
  3. ConstructionMar 2012 (completed)
  4. OperatingApr 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
17.1 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
HU12 0LA
Coordinates
53.7518, -0.0697

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Roos Wind Farm (GB) compares

248th of 488largest wind farms in the UK register
15th of 31in Yorkshire and the Humber
0.06%of listed UK wind farms capacity
β‰ˆ 39 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 17.1 MW station would generate roughly 39 GWh of electricity in a year, similar to the annual use of about 14,420 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Roos Wind Farm (Resubmission)
Developer / operator
Renewable Energy Systems (RES)
Planning authority
East Riding of Yorkshire
Planning reference
08/05692/STPLFE
Application submitted
20 January 2009
Permission granted
13 May 2010
Construction started
1 March 2012
Began operating
2 April 2013
Capacity in planning record
17.1 MW
Address
Land To The West Of Ivy House Rectory Road Roos East Riding Of Yorkshire, Humberside
REPD reference
3835

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.