WIND Β· OPERATIONAL

A'Chruach

A'Chruach is a 42.6 MW onshore wind farm in Scotland, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
42.6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
PA31 8BA
Coordinates
56.1191, -5.2552

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How A'Chruach compares

123rd of 488largest wind farms in the UK register
68th of 199in Scotland
0.14%of listed UK wind farms capacity
β‰ˆ 97 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 42.6 MW station would generate roughly 97 GWh of electricity in a year, similar to the annual use of about 35,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Planning Permission Expired
Site name in planning record
A'Chruach (Phase 2)
Developer / operator
Muirhall Energy (formerly Infinis)
Planning authority
Argyll and Bute
Planning reference
14/02829/PP
Application submitted
12 December 2014
Permission granted
28 August 2015
Capacity in planning record
4 MW
Address
Land 1.5km north of Blackmill Loch adjacent to consented A'Chruach Windfarm, West Of Minard, Argyll and Bute
REPD reference
4937

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026