WIND Β· OPERATIONAL

Lissett Airfield

Lissett Airfield is a 30 MW onshore wind farm in Yorkshire and the Humber, England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJul 2006 (completed)
  2. ConsentedFeb 2007 (completed)
  3. Construction (completed)
  4. OperatingFeb 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
30 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
YO25 8PZ
Coordinates
54.0071, -0.2885

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Lissett Airfield compares

160th of 488largest wind farms in the UK register
9th of 31in Yorkshire and the Humber
0.10%of listed UK wind farms capacity
β‰ˆ 68 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 30 MW station would generate roughly 68 GWh of electricity in a year, similar to the annual use of about 25,310 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Lissett Airfield Wind Farm
Developer / operator
Novera Energy
Planning authority
East Riding of Yorkshire
Planning reference
06/05618/STPLFE
Application submitted
10 July 2006
Permission granted
22 February 2007
Began operating
20 February 2009
Capacity in planning record
30 MW
Address
1.5km west of Lisset, East Yorkshire, Humberside
REPD reference
3539

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.