WIND Β· OPERATIONAL

Sixpenny Wood

Sixpenny Wood is a 20.5 MW onshore wind farm in Yorkshire and the Humber, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJul 2007 (completed)
  2. ConsentedDec 2009 (completed)
  3. ConstructionFeb 2012 (completed)
  4. OperatingJul 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
20.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DN14 7TU
Coordinates
53.7380, -0.8114

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Sixpenny Wood compares

220th of 488largest wind farms in the UK register
12th of 31in Yorkshire and the Humber
0.07%of listed UK wind farms capacity
β‰ˆ 47 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.5 MW station would generate roughly 47 GWh of electricity in a year, similar to the annual use of about 17,290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Sixpenny Wood Windfarm
Developer / operator
Greencoat UK Wind
Planning authority
East Riding of Yorkshire
Planning reference
07/04680/STPLFE
Application submitted
20 July 2007
Permission granted
8 December 2009
Construction started
1 February 2012
Began operating
15 July 2013
Capacity in planning record
33 MW
Address
Between Eastrington, Gilberdyke, Kilpin and Laxton, Humberside
REPD reference
3942

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.