WIND Β· OPERATIONAL

Carsington Wind Energy Ltd

Carsington Wind Energy Ltd is a 8.2 MW onshore wind farm in East Midlands England, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England
Project stageOperating
  1. PlanningJan 2007 (completed)
  2. ConsentedSep 2008 (completed)
  3. ConstructionMay 2012 (completed)
  4. OperatingFeb 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Engie Power
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DE4 4HF
Coordinates
53.0845, -1.6336

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carsington Wind Energy Ltd compares

358th of 488largest wind farms in the UK register
24th of 34in East Midlands
0.03%of listed UK wind farms capacity
β‰ˆ 19 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8.2 MW station would generate roughly 19 GWh of electricity in a year, similar to the annual use of about 6,920 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by Engie Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Carsington Pasture
Developer / operator
Carsington Wind Energy Limited
Planning authority
Derbyshire Dales
Planning reference
07/00083/FUL
Application submitted
29 January 2007
Permission granted
17 September 2008
Construction started
15 May 2012
Began operating
5 February 2014
Capacity in planning record
8 MW
Address
Carsington Pasture, Derbyshire Dales, Derbyshire
REPD reference
4665

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.