Moneystone
Moneystone is a 4.98 MW solar farm in West Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 4.98 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- ST10 2DZ
- Coordinates
- 53.0133, -1.9333
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Moneystone compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by AnescoNearby generating sites
- Heywood Grange Β· 4.96 MW solar farm7.9 km
- Woodhouse Β· 4.98 MW solar farm8.7 km
- UK Solar (Lower Newton) LLP Β· 11.9 MW solar farm9.4 km
- Willows Farm Β· 4.62 MW solar farm13.7 km
- The Willows Β· 4.73 MW solar farm13.7 km
- Somersall Β· 2.56 MW solar farm14.8 km
- Holtwood Β· 4.99 MW solar farm15.1 km
- Dove View Β· 4.57 MW solar farm17.2 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Moneystone Quarry Solar Farm
- Developer / operator
- SBC Renewables
- Planning authority
- Staffordshire Moorlands
- Planning reference
- SMD/2015/0220
- Application submitted
- 15 April 2015
- Permission granted
- 22 July 2015
- Construction started
- 1 July 2016
- Began operating
- 21 November 2016
- Capacity in planning record
- 5 MW
- Address
- Moneystone Quarry, Cheadle Road, Oakamoor, Stoke-On-Trent,, Staffordshire, ST10 2DZ
- REPD reference
- 5229
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.