The Willows
The Willows is a 4.73 MW solar farm in West Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 4.73 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CV37 9RG
- Coordinates
- 52.9006, -1.8489
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How The Willows compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.73 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,530 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by AnescoNearby generating sites
- Willows Farm Β· 4.62 MW solar farm0.0 km
- Holtwood Β· 4.99 MW solar farm2.4 km
- Somersall Β· 2.56 MW solar farm3.0 km
- Dove View Β· 4.57 MW solar farm3.7 km
- Green Lane Β· 4.23 MW solar farm5.3 km
- Woodhouse Β· 4.98 MW solar farm5.4 km
- Aston House Β· 19.8 MW solar farm6.8 km
- Marchington Β· 5 MW solar farm6.8 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Solar farm at land at The Willows, Uttoxeter
- Developer / operator
- TGC Renewables
- Planning authority
- East Staffordshire
- Planning reference
- P/2015/00434
- Application submitted
- 15 April 2015
- Permission granted
- 24 July 2015
- Construction started
- 12 December 2016
- Began operating
- 31 March 2017
- Capacity in planning record
- 6.4 MW
- Address
- Land South East Of The Willows, Dove Walk, Uttoxeter, Staffordshire, Staffordshire, ST14 8EJ
- REPD reference
- 5241
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.