Aston House
Aston House is a 19.8 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 19.8 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DE6 5AG
- Coordinates
- 52.8832, -1.7513
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Aston House compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 19.8 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,430 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by Greencoat CapitalNearby generating sites
- Marchington Β· 5 MW solar farm1.6 km
- Green Lane Β· 4.23 MW solar farm2.2 km
- Dove View Β· 4.57 MW solar farm4.0 km
- Somersall Β· 2.56 MW solar farm4.3 km
- Holtwood Β· 4.99 MW solar farm4.5 km
- Rolleston Β· 18 MW solar farm6.6 km
- Willows Farm Β· 4.62 MW solar farm6.8 km
- The Willows Β· 4.73 MW solar farm6.8 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Aston House Solar Farm
- Developer / operator
- Solar century / Magnetar Solar
- Planning authority
- Derbyshire Dales
- Planning reference
- 14/00450/FUL
- Application submitted
- 7 July 2014
- Permission granted
- 17 November 2014
- Construction started
- 1 December 2014
- Began operating
- 27 March 2015
- Capacity in planning record
- 20 MW
- Address
- Land At Aston House Farm, Aston Lane, Sudbury, Derbyshire, Derbyshire, DE6 5HG
- REPD reference
- 1955
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.