Green Lane
Green Lane is a 4.23 MW solar farm in West Midlands England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 4.23 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- ST14 8LQ
- Coordinates
- 52.8755, -1.7810
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Green Lane compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.23 MW station would generate roughly 3.7 GWh of electricity in a year, similar to the annual use of about 1,370 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by Lightsource BPNearby generating sites
- Marchington Β· 5 MW solar farm1.5 km
- Dove View Β· 4.57 MW solar farm1.9 km
- Aston House Β· 19.8 MW solar farm2.2 km
- Holtwood Β· 4.99 MW solar farm3.3 km
- Somersall Β· 2.56 MW solar farm3.6 km
- Willows Farm Β· 4.62 MW solar farm5.3 km
- The Willows Β· 4.73 MW solar farm5.3 km
- Rolleston Β· 18 MW solar farm7.6 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land of Green Lane
- Developer / operator
- TGC Renewables
- Planning authority
- East Staffordshire
- Planning reference
- P/2015/00791
- Application submitted
- 3 July 2015
- Permission granted
- 23 September 2015
- Construction started
- 12 December 2016
- Began operating
- 31 March 2017
- Capacity in planning record
- 5.8 MW
- Address
- Land At, Green Lane, Marchington, Uttoxeter, Staffordshire, ST14 8LQ
- REPD reference
- 5424
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.