Crow Trees Solar Farm
Crow Trees Solar Farm is a 4.69 MW solar farm in East Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 4.69 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- NG17 1JF
- Coordinates
- 53.1099, -1.2956
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Crow Trees Solar Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.69 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by AnescoNearby generating sites
- Averill Farm Β· 5 MW solar farm7.4 km
- Lindhurst Β· 9 MW onshore wind farm9.7 km
- Watnall Β· 10 MW solar farm11.2 km
- 30Acres Β· 3.77 MW solar farm12.4 km
- Belper Β· 5 MW solar farm13.1 km
- Bolsovermoor Quarry Β· 5 MW solar farm14.3 km
- Lodge Farm Β· 4.88 MW solar farm14.9 km
- Arkwright CIC Β· 2.48 MW solar farm15.3 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Crow Trees Farm
- Developer / operator
- Foresight
- Planning authority
- Ashfield
- Planning reference
- V/2014/0188
- Application submitted
- 24 April 2014
- Permission granted
- 25 June 2014
- Construction started
- 15 November 2015
- Began operating
- 23 March 2016
- Capacity in planning record
- 4.7 MW
- Address
- Crow Trees Farm, Pinxton Lane, Fulwood, Sutton In Ashfield, Nottinghamshire, NG17 1JF
- REPD reference
- 2165
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.