Project stageOperating
  1. PlanningApr 2014 (completed)
  2. ConsentedJun 2014 (completed)
  3. ConstructionNov 2015 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.69 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NG17 1JF
Coordinates
53.1099, -1.2956

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crow Trees Solar Farm compares

473rd of 662largest solar farms in the UK register
69th of 95in East Midlands
0.08%of listed UK solar farms capacity
β‰ˆ 4.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.69 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Crow Trees Farm
Developer / operator
Foresight
Planning authority
Ashfield
Planning reference
V/2014/0188
Application submitted
24 April 2014
Permission granted
25 June 2014
Construction started
15 November 2015
Began operating
23 March 2016
Capacity in planning record
4.7 MW
Address
Crow Trees Farm, Pinxton Lane, Fulwood, Sutton In Ashfield, Nottinghamshire, NG17 1JF
REPD reference
2165

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.