SOLAR Β· OPERATIONAL

30Acres

30Acres is a 3.77 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedNov 2015 (completed)
  3. ConstructionJun 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.77 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NG20 8XT
Coordinates
53.2056, -1.2015

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How 30Acres compares

538th of 662largest solar farms in the UK register
77th of 95in East Midlands
0.07%of listed UK solar farms capacity
β‰ˆ 3.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.77 MW station would generate roughly 3.3 GWh of electricity in a year, similar to the annual use of about 1,220 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
SPF Thirty Acres Farm
Developer / operator
Navitas Project
Planning authority
Mansfield
Planning reference
2015/0451/NT
Application submitted
22 July 2015
Permission granted
18 November 2015
Construction started
1 June 2016
Began operating
31 March 2016
Capacity in planning record
3.8 MW
Address
Land Associated with, Carter L, Warsop Vale, Thiry Acres Farm, Mansfield, Nottinghamshire, Nottinghamshire, NG20 8XT
REPD reference
5396

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.