Bolsovermoor Quarry
Bolsovermoor Quarry is a 5 MW solar farm in East Midlands England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- S44 6XE
- Coordinates
- 53.2361, -1.2530
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bolsovermoor Quarry compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by Lightsource BPNearby generating sites
- Oxcroft Β· 4.19 MW solar farm4.6 km
- 30Acres Β· 3.77 MW solar farm4.8 km
- Hunciecroft Β· 7.62 MW solar farm5.3 km
- Barlborough Β· 0.85 MW onshore wind farm5.8 km
- Arkwright CIC Β· 2.48 MW solar farm6.6 km
- Arkwright SPV Β· 5 MW solar farm6.6 km
- Welbeck Β· 11.3 MW solar farm7.8 km
- Lodge Farm Β· 4.88 MW solar farm8.4 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land at Bolsover Moor Quarry
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Bolsover
- Planning reference
- 15/00334/FUL
- Application submitted
- 15 July 2015
- Permission granted
- 29 September 2015
- Construction started
- 4 January 2017
- Began operating
- 1 March 2017
- Capacity in planning record
- 5 MW
- Address
- Land To The North And East Of, The Works, Whaley Road, Bolsover, Chesterfield, Derbyshire, Derbyshire, S44 6XE
- REPD reference
- 5404
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.