πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Cairnborrow Wind Energy Ltd

Cairnborrow Wind Energy Ltd is a 10.3 MW onshore wind farm in Scotland, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningOct 2013 (completed)
  2. ConsentedAug 2014 (completed)
  3. ConstructionAug 2015 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Engie Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
AB54 4XP
Coordinates
57.4639, -2.8992

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Cairnborrow Wind Energy Ltd compares

319th of 488largest wind farms in the UK register
169th of 199in Scotland
0.03%of listed UK wind farms capacity
β‰ˆ 23 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10.3 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Engie Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Cairnborrow
Developer / operator
Engie (GDF Suez)
Planning authority
Aberdeenshire
Planning reference
APP/2013/3282
Application submitted
9 October 2013
Permission granted
25 August 2014
Construction started
12 August 2015
Began operating
9 February 2017
Capacity in planning record
10 MW
Address
Land at Cairnborrow Huntly, Grampian
REPD reference
4350

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.