PUMPED STORAGE Β· OPERATIONAL

Dinorwig Power Station

The Electric Mountain. Dinorwig Power Station is a 1,800 MW pumped-storage station in Wales, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Wales
  • Commissioned 1984

Key facts

Installed capacity
1,800 MW
Status
Operational
Technology
Pumped-storage
Operator
Engie Power
Region
Wales
Country
Wales
Coordinates
53.1186, -4.1023
Commissioned
1984
Turbines
6
Response time seconds
16
Head metres
600
Upper reservoir
Marchlyn Mawr
Lower reservoir
Llyn Peris
Storage hours
6

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Dinorwig Power Station compares

1st of 4largest pumped-storage stations in the UK register
1st of 2in Wales
62.1%of listed UK pumped-storage stations capacity

Pumped-storage stations work like giant batteries: they pump water uphill into a reservoir when electricity is cheap or plentiful and release it through turbines when demand is high.

All UK hydro schemes and pumped-storage stations Hydro schemes and pumped-storage stations in Wales All run by Engie Power

About Dinorwig Power Station

History

Built between 1974 and 1984 inside the disused Dinorwic slate quarry, it took ten years and ten million tonnes of excavation. The station uses two reservoirs β€” Marchlyn Mawr above and Llyn Peris below β€” with a 600m head. At the time it was the largest civil engineering project ever undertaken by the UK government.

Did you know?

  • Cavern hall is 180m long and 60m high β€” taller than St Paul's Cathedral dome
  • Used to stabilise the grid during TV ad breaks
  • Contains 16km of underground tunnels
  • Can power 2.5 million homes for 6 hours

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Dinorwig
Developer / operator
First Hydro Company
Planning authority
Gwynedd
Construction started
1 January 1978
Began operating
1 January 1983
Capacity in planning record
1,728 MW
Address
Snowdonia, Conwy, LL55 4TY
REPD reference
6839

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source