Parciau is a 12.7 MW solar farm in Wales, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 12.7 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- LL55 1TS
- Coordinates
- 53.1653, -4.2414
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Parciau compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12.7 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 4,130 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by Octopus InvestmentsNearby generating sites
- Cwm Dyli Β· 9.9 MW hydroelectric station9.2 km
- Dinorwig Power Station Β· 1,800 MW pumped-storage station10.6 km
- Anglesey Β· 14.9 MW solar farm11.7 km
- Bryn Yr Odyn Β· 14.9 MW solar farm13.2 km
- Garnedd Β· 0.56 MW small hydro scheme23.0 km
- Trysglwyn Β· 5.6 MW onshore wind farm24.3 km
- Croesor Β· 0.51 MW small hydro scheme24.3 km
- Llyn Alaw Β· 20.4 MW onshore wind farm25.8 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Parciau Farm Solar Park
- Developer / operator
- Kronos Solar
- Planning authority
- Gwynedd
- Planning reference
- C14/0498/20/LL
- Application submitted
- 6 June 2014
- Permission granted
- 22 September 2014
- Construction started
- 15 November 2014
- Began operating
- 23 March 2015
- Capacity in planning record
- 13.9 MW
- Address
- Parciau Farm, Griffiths Crossing, Caernarfon, Gwynedd, Gwynedd, LL55 1TS
- REPD reference
- 2110
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.