Parciau

Parciau is a 12.7 MW solar farm in Wales, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningJun 2014 (completed)
  2. ConsentedSep 2014 (completed)
  3. ConstructionNov 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
12.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LL55 1TS
Coordinates
53.1653, -4.2414

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Parciau compares

98th of 662largest solar farms in the UK register
8th of 75in Wales
0.23%of listed UK solar farms capacity
β‰ˆ 11 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 12.7 MW station would generate roughly 11 GWh of electricity in a year, similar to the annual use of about 4,130 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Parciau Farm Solar Park
Developer / operator
Kronos Solar
Planning authority
Gwynedd
Planning reference
C14/0498/20/LL
Application submitted
6 June 2014
Permission granted
22 September 2014
Construction started
15 November 2014
Began operating
23 March 2015
Capacity in planning record
13.9 MW
Address
Parciau Farm, Griffiths Crossing, Caernarfon, Gwynedd, Gwynedd, LL55 1TS
REPD reference
2110

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.