Llyn Alaw
Llyn Alaw is a 20.4 MW onshore wind farm in Wales, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 20.4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- LL68 0TB
- Coordinates
- 53.3544, -4.4656
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Llyn Alaw compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.4 MW station would generate roughly 46 GWh of electricity in a year, similar to the annual use of about 17,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by Venitent Energy ServicesNearby generating sites
- Ysgellog Β· 4.6 MW onshore wind farm6.2 km
- Wylfa Nuclear Power Station Β· 980 MW nuclear power station6.9 km
- Porth Wen Β· 69.1 MW solar farm7.6 km
- Trysglwyn Β· 5.6 MW onshore wind farm8.2 km
- Bryn Yr Odyn Β· 14.9 MW solar farm14.1 km
- Anglesey Β· 14.9 MW solar farm19.8 km
- Parciau Β· 12.7 MW solar farm25.8 km
- Cwm Dyli Β· 9.9 MW hydroelectric station34.4 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Llanbabo Wind Farm
- Developer / operator
- MANWEB Generation Holdings
- Planning authority
- Isle of Anglesey
- Application submitted
- 5 August 1994
- Permission granted
- 19 December 1996
- Began operating
- 1 October 1997
- Capacity in planning record
- 20.4 MW
- Address
- Llanbabo Wind Farm Land tp the north of Llyn Alaw Isle of Anglesey Gwynedd, Gwynedd
- REPD reference
- 2582
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.