πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Porth Wen

Porth Wen is a 69.1 MW solar farm in Wales, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningMar 2016 (completed)
  2. ConsentedMar 2018 (completed)
  3. ConstructionJun 2022 (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
69.1 MW
Status
Operational
Technology
Solar Β· PV
Operator
EDF Energy
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LL66 0AT
Coordinates
53.4142, -4.4096

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Porth Wen compares

5th of 662largest solar farms in the UK register
2nd of 75in Wales
1.2%of listed UK solar farms capacity
β‰ˆ 61 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 69.1 MW station would generate roughly 61 GWh of electricity in a year, similar to the annual use of about 22,420 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Under Construction
Developer / operator
EDF Energy Renewables
Planning authority
Isle of Anglesey
Planning reference
20C310B/EIA/RE
Application submitted
1 March 2016
Permission granted
9 March 2018
Construction started
1 June 2022
Capacity in planning record
49.9 MW
Address
Llanbadrig, Cemaes Bay, Gwynedd, Isle of Anglesey, LL67
REPD reference
6071

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.