Scotia Wind (Craigengelt) Ltd
Scotia Wind (Craigengelt) Ltd is a 20 MW onshore wind farm in Scotland, operated by Engie Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 20 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Engie Power
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- FK7 9QS
- Coordinates
- 56.0543, -4.0497
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Scotia Wind (Craigengelt) Ltd compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20 MW station would generate roughly 46 GWh of electricity in a year, similar to the annual use of about 16,870 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Engie PowerNearby generating sites
- Dundee Β· 4 MW onshore wind farm3.4 km
- Earlsburn Β· 37.5 MW onshore wind farm3.4 km
- Kingsburn Β· 22.5 MW onshore wind farm5.8 km
- Falkirk Tod Hill Β· 11.4 MW onshore wind farm11.9 km
- Greendykeside Β· 4 MW onshore wind farm18.3 km
- Rhodders Β· 12.3 MW onshore wind farm19.6 km
- Burnhead Moss Β· 26 MW onshore wind farm21.6 km
- Longannet Power Station Β· 2,400 MW coal-fired power station23.2 km
Also operated by Engie Power
Engie Power operates 11 sites in the register. Largest first:
- Dinorwig Power Station Β· pumped-storage station1,800 MW
- Ffestiniog Power Station Β· pumped-storage station360 MW
- Sober Hill Wind Farm Ltd Β· onshore wind farm12.3 MW
- Blantyre Muir Wind Energy Ltd Β· onshore wind farm12.3 MW
- Cairnborrow Wind Energy Ltd Β· onshore wind farm10.3 MW
- Barlockhart Moor Wind Energy Ltd Β· onshore wind farm8.2 MW
- Carsington Wind Energy Ltd Β· onshore wind farm8.2 MW
- Flimby Wind Energy Ltd Β· onshore wind farm6.15 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Craigengelt
- Developer / operator
- Scotia Wind Ltd
- Planning authority
- Stirling
- Planning reference
- 06/01052/DET
- Application submitted
- 1 December 2006
- Permission granted
- 12 February 2008
- Construction started
- 1 May 2009
- Began operating
- 31 March 2010
- Capacity in planning record
- 20 MW
- Address
- Craigengelt Hill, Stirling, Stirling
- REPD reference
- 2940
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.