Falkirk Tod Hill is a 11.4 MW onshore wind farm in Scotland, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 11.4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Capital Dynamics UK
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- FK5 4SJ
- Coordinates
- 56.0325, -3.8621
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Falkirk Tod Hill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 11.4 MW station would generate roughly 26 GWh of electricity in a year, similar to the annual use of about 9,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Capital Dynamics UKNearby generating sites
- Longannet Power Station Β· 2,400 MW coal-fired power station11.6 km
- Scotia Wind (Craigengelt) Ltd Β· 20 MW onshore wind farm11.9 km
- Burnhead Moss Β· 26 MW onshore wind farm12.6 km
- Greendykeside Β· 4 MW onshore wind farm13.6 km
- Rhodders Β· 12.3 MW onshore wind farm14.5 km
- Dundee Β· 4 MW onshore wind farm15.1 km
- Earlsburn Β· 37.5 MW onshore wind farm15.1 km
- Kingsburn Β· 22.5 MW onshore wind farm17.6 km
Also operated by Capital Dynamics UK
Capital Dynamics UK operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Tod Hill Farm Wind Turbines
- Developer / operator
- Falkirk Tod Hill Wind Limited
- Planning authority
- Falkirk
- Planning reference
- P/11/0326/FUL
- Application submitted
- 17 June 2011
- Permission granted
- 6 June 2012
- Construction started
- 1 April 2014
- Began operating
- 22 January 2015
- Capacity in planning record
- 12 MW
- Address
- Todhill Farm Larbert, Falkirk, FK5 4SH
- REPD reference
- 3415
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.