Earlsburn
Earlsburn is a 37.5 MW onshore wind farm in Scotland, operated by Falck Renewables SpA. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 37.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Falck Renewables SpA
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 56.0708, -4.0955
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Earlsburn compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 37.5 MW station would generate roughly 85 GWh of electricity in a year, similar to the annual use of about 31,630 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Falck Renewables SpANearby generating sites
- Dundee Β· 4 MW onshore wind farm0.0 km
- Scotia Wind (Craigengelt) Ltd Β· 20 MW onshore wind farm3.4 km
- Kingsburn Β· 22.5 MW onshore wind farm3.6 km
- Falkirk Tod Hill Β· 11.4 MW onshore wind farm15.1 km
- Rhodders Β· 12.3 MW onshore wind farm21.1 km
- Greendykeside Β· 4 MW onshore wind farm21.3 km
- Braes of Doune Wind Farm Β· 72 MW onshore wind farm22.2 km
- Burnhead Moss Β· 26 MW onshore wind farm25.0 km
Also operated by Falck Renewables SpA
Falck Renewables SpA operates 12 sites in the register. Largest first:
- Kilbraur Β· onshore wind farm67.5 MW
- Millennium Β· onshore wind farm65 MW
- Cambrian Β· onshore wind farm58.5 MW
- Auchrobert Β· onshore wind farm38.8 MW
- West Browncastle Β· onshore wind farm30 MW
- Ben Aketil Β· onshore wind farm27.6 MW
- Assel Valley Β· onshore wind farm25 MW
- Kingsburn Β· onshore wind farm22.5 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Falck Renewables
- Planning authority
- Stirling
- Planning reference
- 03/00936/DET
- Application submitted
- 17 November 2003
- Permission granted
- 1 July 2004
- Construction started
- 1 July 2006
- Began operating
- 1 February 2007
- Capacity in planning record
- 37.5 MW
- Address
- Hart Hill, Fintry , Stirling, Stirling
- REPD reference
- 3201
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.